All Asbestos Matrices.
One Lab.
PCM · TEM · PLM · Air monitoring · AHERA clearance · Bulk analysis · Waste solids. Triple-accredited for every regulatory requirement in NJ, NY, and nationwide.
Three Bodies. Every Jurisdiction.
NJ NELAP · NY ELAP · NVLAP — the triple-accreditation that covers every regulatory requirement your clients face. Most labs hold one. IRIS holds three.
NJ NELAP #20045
NJ — TEM & PCMNY ELAP #12738
NY — All matricesNVLAP #600211-0
Federal — Nationwide recognitionAccreditations current through 2027. IRIS results accepted for NJ & NY regulatory submissions and other states via NVLAP recognition.
Three Matrices. Five Methods. Every Regulatory Need.
Air monitoring · Bulk material analysis · Waste solids — PCM, TEM, and PLM across all matrices.
Air Monitoring
Bulk Material Analysis
Waste Solids & Non-Friable (NOB)
Need help selecting the right method and accreditation for your project jurisdiction? Send us a message and we’ll match you to the right test.
Which Test Is Right for Your Project?
Match your regulatory requirement and project phase to the correct method and accreditation.
When Is Asbestos Testing Required?
Four distinct regulatory frameworks — each with its own trigger, method requirement, and enforcement authority.
AHERA
- All K-12 schools must be inspected and re-inspected every 3 years for ACM under 40 CFR Part 763
- Post-abatement air clearance by TEM (40 CFR 763 App. A) required before reoccupancy
- IRIS NVLAP 600211-0 + NY ELAP certification satisfies AHERA requirements in all jurisdictions
IRIS NVLAP + NY ELAP satisfies AHERA in all jurisdictions.
OSHA
- 29 CFR 1926.1101 (construction) · 1910.1001 (general industry): PEL 0.1 f/cc TWA, AL 0.1 f/cc
- Initial exposure assessment required when workers may disturb ACM or PACM
- PCM by NIOSH 7400 is the OSHA-accepted method; results must be available within 5 working days
NJ NELAP + NY ELAP accreditation covers OSHA requirements.
NESHAP
- EPA 40 CFR Part 61 Subpart M applies to all demolition and significant renovations
- Owner/operator must survey for RACM before demolition; bulk PLM results drive notification requirement
- Regulated ACM (RACM) threshold: ≥160 sq ft friable, ≥260 linear ft, or ≥35 cubic ft
IRIS NVLAP 600211-0 results accepted by EPA for NESHAP reporting.
Waste Disposal
- Demolition waste containing ACM must be classified as hazardous or non-hazardous before disposal
- NY ELAP accredited methods required for waste classification submitted to NY DEC or NJ DEP
- Non-friable material: NOB by PLM (Item 198.6) determines if friability threshold is exceeded
NY ELAP #12738 + NJ NELAP results accepted by NY DEC and NJ DEP.
How It Works — Four Steps.
From sample media to certified analytical report — chain of custody maintained from collection to delivery.
Select Your Method
Choose your method: PCM cassettes (air), PLM containers (bulk), or TEM cassettes (AHERA clearance). Download the chain-of-custody form for your method and ship with a pre-paid FedEx label.
Contact the LabCollect & Complete COC
Air: cassette at breathing zone (PCM) or aggressive sampling (AHERA TEM). Bulk: 1–2 cm² sample per location, bagged separately. Complete COC with location, material description, and accreditation required.
Ship Overnight or Drop Off
Pre-paid shipping label included. Air cassettes and bulk samples ship at ambient — no refrigeration. AHERA clearance: ship within 24 hrs of collection for timely results.
Certified Report
PCM: f/cc fiber count with OSHA PEL/AL comparison. Bulk PLM: % asbestos by type, NESHAP threshold noted. TEM AHERA: s/mm² result with clearance pass/fail. Jurisdiction-specific reporting format.
Chain of Custody — Download for Your Shipment
Include a completed chain of custody with every sample shipment.
NJ NELAP · NY ELAP #12738 · NVLAP 600211-0 · PCM · TEM · PLM
One Lab.
Multiple Asbestos Methods.
Multiple Jurisdictions.
Air monitoring · AHERA clearance · Bulk PLM · Waste solids TEM · NOB by PLM. NJ and NY regulatory submissions from one accredited source.