Wastewater Metals Analysis

NPDES Compliance
Starts With
Accurate Analysis.

Effluent characterization · Industrial pretreatment · NPDES permit compliance. NJ NELAP certified — results accepted for discharge monitoring reports.

NJ NELAP TNI Accredited NPDES Compliant EPA 200.5 / 200.7 ICP Technology
Request a Quote → Submit Your Permit
Regulatory context

Your Permit Specifies the Test. We Run It.

NPDES effluent limits, industrial pretreatment programs, and local discharge ordinances all mandate metals analysis. Exceeding permit limits triggers violations, fines, and permit suspension. Accurate effluent characterization is your first line of defense.

Exceeding permit limits triggers violations, fines, and permit suspension. Accurate effluent characterization is your first line of defense against enforcement action.
NPDES Compliance
  • Clean Water Act Section 402 — all point source discharges require NPDES permits
  • Permit specifies effluent limits for metals — typically daily max and monthly average
  • Monitoring frequency defined in permit — monthly to quarterly for most metals
Industrial Pretreatment
  • 40 CFR Part 403 — indirect dischargers must meet local limits before discharge to POTW
  • Categorical pretreatment standards for electroplating, metal finishing, food processing, and circuit board manufacturing
  • Local POTW may have stricter limits — IRIS results directly comparable to permit limits
Baseline & Closure
  • Pre-discharge baseline characterization documents natural background
  • Site closure or permit termination requires exit sampling to document final discharge quality
  • Litigation support — chain-of-custody reports accepted in administrative and civil proceedings

IRIS NJ NELAP certification means results are accepted for all NJ NPDES permit reporting.

Service menu

Three Wastewater Metals Services.

NPDES compliance · Pretreatment · Baseline & closure — each answers a different regulatory requirement.

NPDES
Compliance Monitoring

EPA 200.5 / 200.7 · ICP · NJ NELAP
Analytes
Permit-specified metals
Best For
Routine effluent monitoring per permit schedule · Monthly/quarterly compliance reporting to NJ DEP
Regulation
40 CFR Part 122 · Clean Water Act · NJ NPDES
Turnaround
5–7 business days

Industrial
Pretreatment

EPA 200.5 / 200.7 · ICP · NJ NELAP
Analytes
Categorical + local limits
Best For
Indirect dischargers to POTW · Metal finishing, electroplating, food processing, circuit board manufacturing
Regulation
40 CFR Part 403 · Local POTW pretreatment limits
Turnaround
5–7 business days

Effluent
Characterization

EPA 200.5 / 200.7 · ICP · NJ NELAP
Analytes
Full metals suite
Best For
New discharge permits · Site closure · Litigation support · Baseline documentation
Regulation
CWA §402 · RCRA closure standards · Permit application support
Turnaround
5–7 business days

Your permit specifies the required parameters. Send us your NPDES permit and we’ll confirm the right panel in one reply.

Decision guide

Which Service Matches Your Situation?

Match your permit type and regulatory obligation to the right service.

NPDES permit holder — direct discharge to surface water Permit specifies metals, frequency, and method — EPA 200.5/200.7 results submitted directly to NJ DEP on discharge monitoring reports.
NPDES Compliance Monitoring
Industrial facility discharging to municipal sewer (POTW) 40 CFR Part 403 and local POTW limits apply — categorical or local limits must be met before discharge to the sewer system.
Industrial Pretreatment
New facility permit application or permit renewal — need baseline data Pre-permit baseline documents existing effluent quality; supports application and limit negotiation with the permitting authority.
Effluent Characterization
Site closure, litigation support, or regulatory response Chain-of-custody reports and NJ NELAP certification ensure defensible documentation for administrative and civil proceedings.
Effluent Characterization
Construction stormwater — metals in dewatering discharge Construction general permits require stormwater metals monitoring — EPA 200.5 results satisfy monitoring report requirements.
NPDES Compliance Monitoring

Send us your permit and we’ll build the right sampling schedule. Contact us here.

Process

How It Works

From permit review to certified effluent report.

01

Submit Permit & Quote

Send your NPDES permit or pretreatment program. IRIS reviews required parameters, frequency, and method — quote in 24 hours.

Send Your Permit →
02

Collect Effluent Sample

Composite or grab sampling per permit requirements. IRIS provides pre-cleaned, preserved containers and COC. Nationwide shipping accepted.

03

Ship to Lab

Pre-paid FedEx label included. Preserved samples stable up to 6 months. Hold time tracking documented on COC.

04

Certified Report

ICP results with permit limit comparisons. NJ NELAP certification. Format accepted for NPDES discharge monitoring reports (DMR).

Send us your NPDES permit at our contact form — we’ll confirm required parameters and turnaround same day.

NJ NELAP · TNI Accredited

Your Permit. Our Lab.
Compliant Results.

NPDES compliance · Industrial pretreatment · Effluent characterization. Results accepted for NJ DEP discharge monitoring reports.

Request a Quote → Submit Your Permit
NJ NELAP Certified TNI Accredited EPA 200.5 / 200.7 Methods ICP Technology NPDES Compliant